Our advice: arrange it before 1 December. 14 days left. Get started for 2026

What to watch for as a fleet manager

As a fleet manager you usually apply but do not sign. The steps are the same as for any business. This is what is different for you.

A man with a phone at a charging car in a car park with charge points
Contents
  1. What to watch for
  2. What else to have ready
  3. The step-by-step plan
  4. Frequently asked questions

What to watch for

  • You apply, your authorised signatory signs

    You complete steps 1 to 3 and remain our point of contact. The authorised signatory receives the agreement, has their ID document checked in under 5 minutes and signs online. Agree beforehand who does what. This is where it often stalls: the identity check sits with a director who is not part of the project.

  • Let legal and procurement look first

    If your legal department or procurement is involved, have them read the terms and conditions before you send in step 3. You can download them separately. After sending, the agreement sits with the authorised signatory and steps 1 and 2 are fixed. That keeps the agreement from sitting with legal.

  • The charge points at your drivers’ homes are not included

    The EREs belong to whoever holds the connection in their name. If it is in your driver’s name at home, it falls outside your company’s sign-up. Your driver can sign up through the quickscan on voltico.nl.

What else to have ready

  • Name and email address of the authorised signatory

    Agreed with that person, so the link in the email does not sit unread.

  • All locations with charge points

    All sites in one go, each with its own energy bill.

The list for businesses applies as well. See it on the business page.

Where is the EAN code on your bill?

The step-by-step plan

You sign up like any business, in eight steps. What is above comes on top; the rest is in the business plan, with the screens from the portal.

Signing up your business with VolticoSigning up your business and connecting your charge points in three steps, if they do not run through E-Flux by Road.Spoken in Dutch.
To the business plan

Frequently asked questions

Does the authorised signatory also have to do the sign-up?
No. The contact person and the authorised signatory do not have to be the same person. Only the applicant can finish the steps after signing.
How many authorisations do I need if my company has several sites?
With an authorisation you give Voltico permission to register and trade ERE's on behalf of your company. One authorisation is enough if all connections are in the name of the same company. Do sites belong to different companies? Then each company must sign its own authorisation.
Can I also start earning ERE's halfway through the year?
Yes, you can join at any time. We register your charging sessions retroactively, from 1 January of the same year.
How much must my company charge at minimum to earn ERE's?
For business connections the lower limit is 1,500 kWh of charging per connection per year, provided there is a direct link with your charging system (CPMS). Without such a direct software integration we apply a minimum of 25 MWh a year. Do you also want to link charging sessions specifically to your own solar energy or a battery for 100% ERE’s? That is possible from 50 MWh a year of simultaneous charging and generation, and from 200 MWh a year combined with battery storage. If you stay below those thresholds, your charging sessions are automatically registered on grid electricity as usual.

Next

Everything in the help center