58 days left to choose for 2026. Our advice: arrange it before 31 December. Get started for 2026
MID (Measuring Instruments Directive)
MID refers to the Meetinstrumentenrichtlijn, the European Measuring Instruments Directive setting the requirements a measuring instrument must meet. For ERE booking, MID certification means the meter recording the supply to transport is officially regulated. Since 1 January 2026 that MID meter must be integrated into the charge point; a separate MID meter in the meter or fuse cupboard no longer qualifies.
The alternative is an exclusively metered allocation point: if the connection or the SAP is dedicated solely to transport, not every charging point needs its own MID meter. Businesses that booked in before 2026 with an external meter have a transition year until 1 January 2027; private individuals have no transition year.
See also: MID meters and charge points · ERE registration