28 days left to choose for 2026. Our advice: arrange it before 1 December. Get started for 2026
What do your chargers earn?
Enter how much you charge. You see an indication of your proceeds straight away.
AC charge points
approx. 3 MWh a year each
DC fast chargers
approx. 30 MWh a year each
Estimated net payout
€2,595
- Gross ERE revenue
- + €3,244
- Fee 20% on €0 – €10,000
- − €649
- Net for you
- = €2,595
Sign up before 1 December and your 2026 charging sessions can count from 1 January.
No upfront costs. After 2027 you can cancel every year.
You qualify if your charge points are in the Netherlands, have a MID meter or sit on a connection used only for charging, and you have no other emission credit service provider yet this calendar year.
Market price of 16 Oct 2026. Voltico does not set the ERE price: it forms on a market and moves with it.
How the price is setIs your charger MID-certified?
Search for your brand or model. You see straight away whether the meter in the charger counts for ERE’s.
A first indication per model. What counts is the MID certificate or the EU declaration of conformity of your own charger.
About the ERE revenue estimate
The calculator estimates potential ERE income from EV charging infrastructure using charging volume, eligibility, and market assumptions. Actual revenue depends on verified kWh, regulatory eligibility, credit prices, and the final traded value. For a precise forecast, Voltico can review your charging data and infrastructure setup.
- The ERE price is read live from the latest published market index, with the date it was measured alongside it.
- The renewable share defaults to the grid mix. Your own generation raises it, and with it the number of ERE's.
- Per-vehicle consumption in the fleet estimate is a working assumption, not a measured figure. Use your own numbers if you have them.
Customers and partners working with us
Income calculator
For businesses, yes. When a business demonstrably charges on on-site generation such as solar panels, it can claim up to twice as many credits per kWh. This does not apply to home chargers: home charging always counts at the grid average. With a battery, Voltico's software can also count stored self-generated energy towards 100% EREs. This requires robust substantiation with verifiable data, which is checked during verification. The software optimises this allocation automatically. No rights can be derived from this.
Four legal requirements apply for 100% EREs:
Gross Production Meter (BPM). Inverter data alone does not meet legal requirements. Cost around €2,000 including installation, depending on the situation, plus a meter data subscription.
Hourly charging session data. kWh consumption must be recorded on an hourly basis.
Guarantees of Origin (GvOs). Submitted annually via the Verticer portal.
Volume. Registering your generation is a choice and pays off from approximately 100,000 kWh charged and generated per year. If you do not reach that, or choose not to, we simply register your charging on grid electricity.
Voltico integrates directly with solar installations and smart batteries. Get in touch to discuss the options for your situation.
Experts in the ERE market
Our team knows the ERE market and makes sure your sign-up runs smoothly.








